Abstract

In project planning, visualisations can be powerful tools for communication and in supporting decision-making between stakeholders. However the graphical elements, in terms of form and presentational style, are typically poorly treated and can therefore diminish both the impact and conveyance of information. Traditional timeline representations need to be adapted and modified in order to meet the requirements of specific stakeholder groups and thus fulfil their role as effective visual boundary objects. This paper describes the visualisation designed and developed for the planning of technology upgrade projects across a fleet of military platforms. A real-world application of the visualisation is provided through an illustrative case study based on the front-line fleet of Type 23 frigates of the Royal Navy.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.