Abstract

The 7-mile long Flathead Tunnel in northwestern Montana was required in relocation of Great Northern Railway's main line track prior to impounding water by Libby Dam. Approximately 73% of the tunnel required structural steel tunnel sets for temporary support prior to the placement of concrete lining. A sliding floor, large special tunnel equipment, contractor initiated design changes to eliminate special trim and trench excavation, and laser survey alignment methods all contribute to a high speed excavation operation. Elimination of regularly spaced wall and arch contraction joints with waterstop through a value engineering proposal made a continuous lining operation possible. The conveyor placing system delivered concrete up to tunnel springline through form doors while the pump filled the tunnel arch.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.