Abstract

The fixed-time bipartite containment control for high-order multi-agent systems (MASs) with disturbances is discussed in directed signed graph. The proposed control algorithm guarantees that the trajectories of followers converge into the time-varying geometric space spanned by trajectories of leaders and their opposite trajectories. The settling time is mathematically proved to be dependent only on parameters and independent on the system initial value. On the basis of norm inequality, stability theory and other mathematical analysis, the sufficient condition is given to reach the bipartite containment control. The correctness and efficiency of theoretical results are confirmed via the example.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.