Abstract

Real-time systems often consist of a number of independent processes which operate under an age constraint. In such systems, the maximum time from the start process L i in cycle k to the end in cycle k+1 must not exceed the age constraint A i for that process. The age constraint can be met by using fixed priority scheduling and periods equal to A i /2. However, this approach restricts the number of process sets which are schedulable.In this paper, we define a method for obtaining process periods other than A i /2. The periods are calculated in such a way that the age constraints are met. Our approach is better in the sense that a larger number of process sets can be scheduled compared to using periods equal to A i /2.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call