Abstract
The thermal-mechanical response of the Reference Theta-Pinch Reactor (RTPR) first wall was analyzed. The first wall problems anticipated for a pulsed, high-..beta.. fusion power plant can be ameliorated by either alterations in the physics operating point, materials reengineering, or blanket/first wall reconfiguration. Within the latter ''configuration'' scenario, a two-fold approach has been adopted for the thermal-mechanical portion of the RTPR first wall technology assessment. First, a number of new first wall configurations (bonded or unbonded laminated composites, all-ceramic structures, protective and/or sacrificial ''bumpers'') were considered. Second, a more quantitative failure criterion, based on the developing theories of fracture mechanics, was identified. For each first wall configuration, transient heat transfer and thermoelastic stress calculations have been made. Two-dimensional finite element structural analyses have been made for a variety of mechanical boundary conditions. Only the Al/sub 2/O/sub 3//Nb - 1 Zr system has been considered. The results of this study indicated a wide range of design solutions to the pulsed thermal stress problem anticipated for the RTPR.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.