Abstract

Control chart performance is often measured using average run length or median run length, which gives the expected or median number of samples to signal. It is often argued that on average, one chart will signal a process change quicker than another, and is therefore a better choice. Average and median run length do not, however, answer the question of which method will be more likely to signal first. We introduce the idea of “first to signal” and compare charts based on this criterion.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.