Abstract

An overview of the DO Central Track Trigger (CTT) for the Tevatron Run 2 program is presented. This newly commissioned system uses information from the DO Central Fiber Tracker and Preshower Detectors to generate trigger information for the first level of the three-tiered DO Trigger. The system delivers tracking detector trigger decisions every 132 ns, based on input data flowing at a rate of 475 Gbit per second. Initial results indicate excellent performance of the CTT. First studies of efficiency and trigger performance of the CTT are presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.