Abstract

Abstract Objectives/Scope Majority of the world's gas lifted wells are under-optimized owing to changing reservoir conditions and fluid composition. The gas lift valve (GLV) calibration is required with changing conditions. Apart from that, an allowance needs to be kept so that the valve change remains valid for longer time. Compounding this, when adjusting gas lift parameters, it was not easy for the gas lift operator to make data-driven decisions to assure continuous maximized production. These challenges are further amplified with dual completion strings: fluctuating casing pressure; unpredictable temperatures due to the proximity of the two strings; and inability to individually control the injection rates to each string. String dedicated to the formation with lower productivity and reservoir pressure tends to "rob" gas from other string. Operating philosophy in such cases end up producing from one string. Production optimization in such cases requires frequent intervention with attendant costs and risks thus presents an opportunity to re-imagine gas lift well design. Methods, Procedures, Process ADNOC in collaboration with Silverwell developed a Digital Intelligent Artificial Lift (DIAL) system, which consists of multiple port mandrels to be placed at GLV depths. These mandrels are connetced to the surface operating system with a single electrical cable. The ports can be selectively opened or closed by sending an electric signal from the surface unit. In addition, pressure and temperature sensors are also placed which help record these parameters in real time. Such a system enables the choice of depth, injection rate, loading and unloading sequence controlled from the surface. Realtime optimization is possible as pressure/temperature data helps draw accurate gradient curves. This system makes gas lift optimization possible in dual gas lift wells. Results, Observations, Conclusions It has been estimated that this technology delivers a production increase approaching 20% for single completion wells, and exceeding 40% for dual-string gas lifted wells. Recognizing this opportunity, a business case and implementation plan were developed to pilot a dual-string digitally controlled gas lift optimization system. Novel/Additive Information This paper will describe, the screening phase, business case preparation, risk assessment and validation process, leading to this 1st worldwide implementation of a fully optimized dual completion gas lifted well. Implementation plan of novel digital gas lift production optimization technology in an onshore dual completion well. The completely original approach increases safety, efficiency, operability and surveillance.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call