Abstract

This paper describes the main quality assurance tests developed to check the status of the ALICE TOF SuperModules and included in the commissioning procedures. Some preliminary results concerning these tests on the first two installed super modules are presented as well.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call