Abstract

Movement of adjacent ground and support-of-excavation structures due to pile driving in non-plastic silts is a significant issue in urban areas of Rhode Island. There have been several cases in which such movements have damaged historic structures and transportation infrastructure. The objective of this research is to perform a finite element analysis of a particular case study involving movement of a sheetpile wall-supported excavation due to the excavation and pile driving activities. The case study involved construction of a pile-supported gate and screening structure that is part of the combined sewer overflow project by the Narragansett Bay Commission. The structure was built by first driving sheetpiles around the site, then excavating in stages to the desired elevation, and then driving piles at the base of the excavation. Geotechnical instrumentation at the site included three inclinometers located behind the sheetpile walls and two piezometers in the excavation. Deformations of the wall were observed during each stage of excavation. Additional significant movements of the wall and elevated pore pressures were measured during pile driving. A 2-Dimensional finite element analyses was performed to model the deformation of the sheetpile walls using the commercial software PLAXIS version 7. Soils at the site were modeled with either a linear elastic, perfectly plastic Mohr-Coulomb constitutive model or a non-linear hyperbolic model. The excavation sequence was taken from construction records and simulated directly by removing soil in the model. Properties of the soils (strength and stiffness) were varied around values from the literature until the predicted wall movements matched observations. There was good agreement between the modeled displacements and observations for the first two stages of excavation using reasonable values of strength and stiffness for Rhode Island silts. These parameters would be a good place to start in future modeling efforts involving support of excavation projects in Rhode Island. The only way to simulate the last stages of excavation and wall displacement was to use unreasonably low values of strength and stiffness. Possible explanations for this poor agreement include: a) loss of ground during pumping reduced the stability in the excavation and led to larger movements; b) the excavation caused significant disturbance (almost liquefaction) of the soil at the base of the excavation; and c) the soil surrounding the inclinometer tubes behind the wall moved or became disturbed and the measured movements are not representative of the actual wall movements. Dynamic loading of the soil from pile

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.