Abstract

This is one of a series of papers which describes the placement sequence approach to finite capacity scheduling of factories. In this paper, the author gives a detailed description of how to write a computer program to do finite capacity scheduling using the placement sequence method. The main advantage of the placement sequence method is that it treats multiple and alternative tools and machines as the normal situation, with single machine scheduling as a special case. The author presents a series of flow charts, file structure definitions and a project plan which should enable a research group to get started on an industrial scale finite capacity scheduling program. The author also shows how researchers can tap into the program to write their own higher level algorithms to drive the lower level scheduling calculations. This paper, combined with the explanation of the earlier papers in IJPR, provides a framework for further research into finite capacity scheduling with multiple and alternative tools and machines.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.