Abstract

Finham ‘gas-to-grid’ project near Coventry, UK produces renewable bio-methane from the biogas generated by anaerobic digestion of wastewater sludge. Completed in 2021, the plant now exports bio-methane to the gas grid, contributing to ‘decarbonisation’ of gas supply and helping to deliver water utility Seven Trent’s 2030 net-zero-emissions goals. This paper focuses on the innovative solutions adopted to maximise production of bio-methane, the plant procurement and delivery process, and the challenges of Covid-19, Britain’s exit from the European Union and site-specific constraints.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.