Abstract

The authors solve the problem on forces required to change drilling path of air hammers in soil. Soil mass is assumed a rigid–plastic medium with the Mohr–Coulomb yield, and the air hammer deviator is considered as a nondeformable body. The problem is solved in two stages: introduction of the deviator in soil and travel of the air hammer in soil with the rear deviated at a certain angle. The loads applied to the rear, the forces and the moment required to changing the path of an air hammer in soil are calculated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call