Abstract

Sunda Strait Bridge (SSB) is a mega-infrastructure project offered by the Indonesian government, expected to contribute to national economic growth by bridging economic connectivity between two major islands in Indonesia. At first, SSB construction was offered as a US$10 billion project in 2010. Then in 2011 it was revised into a US$25 billion project with additional scope of work, i.e., industrial area development along the site. Yet it was still unattractive to private investors due to a lack of technical and financial feasibility. Thus, the Value Engineering (VE) approach was used to increase and improve the project’s feasibility by generating innovative ideas. Innovation through additional functions for SSB development is comprised of: 1) development of renewable energy-based power plant by using tidal and wind power; 2) integration of oil and gas pipelines; (3) fiber-optic pipelines; 4) tourism development in Sangiang Island accessed by either road bridge or hanging train; and 5) development of industrial area. The life-cycle cost analysis by IRR and NPV approaches confirmed that SSB development with additional functions increased the internal rate of return of the overall project up to 7.26% and had a positive NPV.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.