Abstract
The Balcones 60 MJ pulsed power supply system is discussed. How the power supply was brought to a full operational state while being used to maintain a rigorous experimental EML shot schedule during the start-up period is discussed. Operational experience acquired as each generator was tested and brought into service, up to full energy and full current discharge, is described. Other topics include routing inspection and maintenance for keeping the power supply at a constant state of readiness, troubleshooting techniques and repair procedures, and safety precautions observed while testing and operating the power supply.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">></ETX>
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.