Abstract
The Grand Ethiopian Renaissance Dam (GERD) on the Nile River will double Ethiopia’s electricity generation and reduce the Nile flow to Sudan and Egypt during reservoir filling. We argue that multi-country negotiations over the initial filling and long-term operation of the GERD reservoir should not overlook key dam engineering features.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have