Abstract

The Muzhailing highway extra-long tunnel is affected by high geostress, and during the construction, large deformation of soft rock frequently occurred. Taking this as the research background, the high-prestressed constant resistance and large deformation anchor cable support scheme was proposed. In the field test, the indicators of three support schemes were compared, including the convergence deformation of surrounding rock, the deep displacement of surrounding rock, the axial force of anchor cable and bolt, and the stress between primary support and surrounding rock. The field test results show that: under the support of bolts, the cumulative deformation of surrounding rock exceeded 1500 mm, and the primary support damage was serious; In the second scheme, under the support of 4 m and 5 m long constant resistance anchor cables, although the large deformation of surrounding rock was controlled, the cumulative deformation was about 600 mm; In the third scheme, under the support of 5 m and 10 m long constant resistance anchor cables, the cumulative maximum deformation of surrounding rock was reduced to 216 mm, and all the data of the field test were within the controllable range. Therefore, high prestressed constant resistance and large deformation anchor cable support measures can effectively control the large deformation of surrounding rock.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call