Abstract

Abstract No field method or procedure exists to measure the effectiveness of cathodic protection (CP) in a coating disbonded region on buried pipelines; however, gaining this capability can be useful to assist the pipeline industry in better control of the pipeline external corrosion. This paper reports two field procedures to estimate the corrosion potentials and rates in a coating disbonded region on buried pipelines and a method to estimate the maximum distance that CP current can penetrate into a coating disbonded region from the holiday. The above estimates can be accomplished through the use of sampled near-pipe soil chemistry, measured pipe native or rest potential, CP “instant-off” potential, and a corrosion rate of the pipe steel measured in simulated soil groundwater in deaerated condition. The field procedures can be implemented without the need of excavations to expose the pipeline surface. The corrosion rates thus determined can be used to assist in prioritizing corrosion susceptible location...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.