Abstract

Rail tracks on peat subgrades can experience significant deflections, some of which have led to derailments. A potential ground stabilization strategy is to use screw piles to reduce rail displacements; however, limited research has been undertaken to investigate the effect of these piles and their performance under cyclic train loading. A field site was instrumented and monitored before and after screw pile installation. The piles were instrumented with strain gauges, piezometers were installed in the peat, and high-speed cameras were used to measure track and subgrade displacements. The load carried by each instrumented pile was approximately 50–60 kN 3 weeks after installation, but reduced to approximately 30 kN after 6 months. Although 1 year’s worth of piezometric data were collected before installation of the piles, it is difficult to conclusively attribute the changes in pore pressures to the piles, particularly because the piezometric data collected after the pile installation were only available for the 7 months that exhibit the period of greatest seasonal fluctuations. The track support system deformations showed no significant difference pre- and post-pile installation. Therefore, based on the monitoring data at this site, it appears that the designed transfer of load from the ties to the piles through arching within the ballast layer was not realized.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.