Abstract

Rail tracks on peat subgrades can experience significant deflections, some of which have led to derailments. A potential ground stabilization strategy is to use screw piles to reduce rail displacements; however, limited research has been undertaken to investigate the effect of these piles and their performance under cyclic train loading. A field site was instrumented and monitored before and after screw pile installation. The piles were instrumented with strain gauges, piezometers were installed in the peat, and high-speed cameras were used to measure track and subgrade displacements. The load carried by each instrumented pile was approximately 50–60 kN 3 weeks after installation, but reduced to approximately 30 kN after 6 months. Although 1 year’s worth of piezometric data were collected before installation of the piles, it is difficult to conclusively attribute the changes in pore pressures to the piles, particularly because the piezometric data collected after the pile installation were only available for the 7 months that exhibit the period of greatest seasonal fluctuations. The track support system deformations showed no significant difference pre- and post-pile installation. Therefore, based on the monitoring data at this site, it appears that the designed transfer of load from the ties to the piles through arching within the ballast layer was not realized.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call