Abstract
In this work, an investigation is carried out in a packaging industry, particularly in dispatch section, using work measurement techniques. Operations in the plant were observed, and a standard process flow is designed so as to minimize unnecessary movements and delay. Further, as an outcome of time study, operating cycle time is fixed for both rim packaging and box packaging procedures using line balancing approach. Finally, the daily production target is revised based on the results. The work is aimed at planning the production output for industries having a product mix using time study techniques.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.