Abstract

On the 2nd runway of Shanghai Pudong International Airport, the field assessment was conducted for rigid pavement stabilization using cementitious grout. The support performance of underlying layers and voids beneath slabs were considered, and the deflection testing was performed before and after grouting. The performance of pre-treatment and post-treatment pavements, and effects of injecting depth and curing time on grouting treatment were statistically analyzed. Results indicated that the support performance of underlying layers along the wheelpath was gradually getting deteriorated and non-uniform during the service period, and the number of voids beneath slabs would also increase annually. The injecting depth at 10 cm under subbase layer was proposed for rigid pavements with the crushed stone subbase layer. Besides, the performance evaluation of cementitious grouting stabilization for rigid pavement was recommended after 60-day curing. Finally, results demonstrated that the objective of pavement stabilization for the 2nd runway was successfully achieved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.