Abstract

The generation and bulk transmission of electricity in England and Wales is the responsibility of the Central Electricity Generating Board (CEGB). Transmission is accomplished using a supergrid network operating at 400 and 275 kV and consisting of overhead lines, cables, switchgear and transformers.