Abstract

AbstractThe North American Electric Reliability Corporation (NERC) is the organization responsible for ensuring the reliability of the bulk‐power system (BPS) in the United States, Mexico, and Canada. NERC recently received approval from the Federal Energy Regulatory Commission (FERC) to streamline the process for tracking and reporting violations of electric reliability standards. On March 15, FERC issued an order conditionally approving the proposed “Find, Fix, Track, and Report” (FFTR) process to expedite the enforcement process for violations of NERC Reliability Standards that pose lesser risk to the BPS.1 In its approval of NERC's new process, however, FERC included several conditions that narrow the range of potential violations eligible for the expedited process. FERC Chairman Jon Wellinghoff hailed the new process as “a major change in how [FERC] will enforce compliance with the Reliability Standards going forward.”2

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.