Abstract
Abstract This paper deals with the problem of developing a production ordering system which maintains high reliability and productivity of multi-stage production and inventory systems with capacity-constraint and machine breakdown. In this paper, two ‘push type’ production ordering systems (Matsuura and Soshiroda 1981) are proposed according to information feedback methods. The influence of forecasting error, the difference between forecasted demands, down-time, and the backlog caused by the restriction of production capacity, upon the production and inventory levels is analysed by each production ordering system. The results indicate that, in designing an effective production ordering system, a feedback method must be chosen according to the conditions of the average loading ratio, the down-time, and the autocorrelation coefficient of demand.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.