Abstract
Depicted in the Article are two stages of technological construction processes for asphalt concrete courses, namely: loading and transportation of asphalt concrete mix. As regards the loading, presented in the Article are two versions of discharging directly into dump body of dump truck or into storage hopper. Mentioned are the advantages of storage hopper usage, as well as the variety of such facilities and the storage time for asphalt concrete mix inside them. Described is the preparation procedure for a dump body of dump truck prior to loading (cleaning, lubrication). Explained are both the proper and improper schemes of loading, as well as the visual signs of asphalt concrete quality after discharging. Described is the right way to protect the asphalt concrete mix against cooling in dump body of dump truck, as well as the proper distance and allowed time-interval for transportation, possible problems occurring during transportation, expediency of using re-loaders for discharging the mix into the receiving hopper of asphalt paver
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.