Abstract

One of the main forms of industrial enterprise development is reconstruction. The main task is to improve the technical level of the enterprise, the quality of products, introduce energy-saving and resource-saving technologies using existing fixed assets. There is a growing interest in reducing maintenance and repair costs, as well as in significantly increasing the time between repairs and reducing the energy intensity of buildings. This article is devoted to the peculiarities of managing a project for the reconstruction of an industrial enterprise, which includes a cultural heritage site. The study was conducted on the example of one of the oldest enterprises in Russia - Joint Stock Company 'Votkinsky Zavod'. The purpose of this study is to develop a methodological basis for the effective management of the reconstruction of an industrial facility based on a database of the technical condition of the main production assets of the Joint Stock Company 'Votkinsky Zavod'. In the course of the study, a detailed analysis of the historically established fund of buildings and structures, in-cluding a cultural heritage site, was carried out with the aim of their possible most optimal further adaptation. The main periods of the development of the plant in the history of its existence are highlighted. The result of the study is an assessment of the technical condition of buildings and structures of the industrial en-terprise under consideration, the classification of a group of buildings according to the periods of construction, according to design schemes and materials used, as well as according to the main defects and damage to structures. As a result of the study, a list of the most common defects and damages to the building structures of buildings and structures was compiled, and a base of technical information on the state of the enterprise's fixed production assets was formed. An algorithm for choosing the optimal variant of the project for the reconstruction of a building, structure or complex is proposed based on the observance of a certain sequence of economic analysis when considering technical, economic, social, aesthetic and time indicators with comparability of design solutions for reconstruction options.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.