Abstract

We consider the possibility to have an active target for the upgrade of the MEG experiment (MEG II). The active target should work as (1) a beam monitoring, to continuously measure the muon stopping rate and therefore provide a direct evaluation of the detector acceptance (or an absolute normalization of the stopped muon); and as (2) an auxiliary device for the spectrometer, to improve the determination of the muon decay vertex and consequently to achieve a better positron momentum and angular resolutions, detecting the positron from the muon decay. In this work we studied the feasibility of detecting minimum ionizing particle with a single layer of 250 μm fiber and the capability to discriminate between the signal induced by either a muon or a positron.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call