Abstract

In order to solve the heat accumulation problem of GSHP system in cooling load dominated area with high humidity in summer, this paper presents a novel HGSHP system based on CT cool-storage in transition season. Then the performance evaluation model for HGSHP system is built on the base of the heat and moisture transfer principle of CT, the GHE multiple borehole finite line heat source model and TRNSYS software. At last, using the evaluation model, an actual project in Nanjing is used as an example to predict the thermal performance of this novel HGSHP system. The results show that using novel HGSHP system, the heat accumulation problem can be well solved.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.