Abstract

Voltage–reactive power control (VVC) on power systems becomes difficult when a load increases or decreases rapidly, especially in the morning and at noon. This is caused mainly by two problems. One is delayed operation and the other is noncooperative operation of facilities. To solve these problems, an advanced method and algorithms for a centralized feed-forwarding control system are presented. They are based on two main steps: forecasting the power system state for several minutes and dispatching reactive power sources optimally based on stepwise linear programming. The proposed method is evaluated and tested for data of a large-scale power system. The results show that the proposed method keeps the voltage constraints well and reduces redundant operation of facilities. © 1998 Scripta Technica, Electr Eng Jpn, 125(1): 18–26, 1998

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.