Abstract
China National Stadium, also known as “Bird’s Nest”, is the main stadium of the 29th Olympic Games in Beijing in 2008, which has successfully held not only the Opening and the Closing ceremonies but also the track and field events. A new problem of rain preventing is brought out to improve the utilization of the Bird’s Nest after the Olympic Games. The scheme of installing an air inflated membrane at the opening of the steel structure is proposed in this paper to solve the rainproof problem of the Bird’s Nest. The form-finding and mechanical analyses of the air inflated membrane are carried out. Comparison between the mechanical performance and dynamical character before and after installing the air inflated membrane structure is given. To verify the analysis results, based on the practical structure of the Bird’s Nest, a test of a 1:20 model membrane is worked out.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.