Abstract

This paper presents the final version of the CBA-DK decision support model for assessment of transport projects. The model makes use of conventional cost-benefit analysis resulting in aggregated single point estimates and quantitative risk analysis using Monte Carlo simulation resulting in interval results. Two special concerns in this paper is firstly the treatment of feasibility risk assessment adopted for evaluation of transport infrastructure projects, and secondly whether this can provide a more robust decision support model. This means moving away from a single point estimate to an interval result, and the determination of suitable probability distributions. Use is made of the reference class forecasting information, such as that developed in Optimism Bias for adjustments to investment decisions that relate to all modes of transport. The CBA-DK decision support model results in more informed decision support towards decision-makers and stakeholders in terms of accumulated descending graphs. The decision support method developed in this paper aims to provide assistance in the analysis and ultimately the choice of action, while accounting for the uncertainties surrounding any transport appraisal scheme.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.