Abstract

Hydrological models are developed for different purposes including flood forecasting, design flood estimation, water resources assessment, and impact study of climate change and land use change, etc. In this study, applicability and uncertainty of two deterministic lumped models, the Xinanjiang (XAJ) model and the Hydrologiska Byråns Vattenbalansavdelning (HBV) model, in design flood estimation are evaluated in a data rich catchment in southern China. Uncertainties of the estimated design flood caused by model equifinality and calibration data period are then assessed using the generalized likelihood uncertainty estimation (GLUE) framework. The results show that: (1) the XAJ model is likely to overestimate the design flood while HBV model underestimates the design flood; (2) the model parameter equifinality has significant impact on the design flood estimation results; (3) with the same length of calibration period, the results of design flood estimation are significantly influenced by which period of the data is used for model calibration; and (4) 15–20 years of calibration data are suggested to be necessary and sufficient for calibrating the two models in the study area.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.