Abstract
The subject of this paper is a computer simulation of the operations of an iron ore unloading port. The object of the work was first, to estimate the advantages of reducing some of the delays caused by the port's physical limitations, and second, to estimate the capacity of the existing system and determine whether this could be modified to handle estimated future foreign ore requirements.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.