Abstract

The demand for electricity in China has been increasing year by year. However, the construction of transmission lines is costly and has significant composite short-term peak characteristics. This article aims to study the feasibility of improving the conductor’s current capacity, analyze data characteristics of typical conductor states and micrometeorological data, figure out the real-time conductor’s current capacity based on the calculation model, analyze the margin for improving the CCC, and lift the power supply potential.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call