Abstract

Live line operation is the most direct and effective means for the maintenance of multi-circuit transmission lines on the same tower. It is also a special operation mode developed to improve the reliability of power supply and the safety of power grid. Therefore, it is necessary to analyze the feasibility of live line operation of multi-circuit transmission lines on the same tower. In this paper, 110 kV, 220 kV and 500 kV multi-circuit transmission lines on the same tower are taken as object, and the safety analysis of live working is carried out for typical working positions. According to the results of operation impact discharge test, the risk rate and safe working distance of live working are obtained; Finally, the minimum effective insulation length of load-bearing tools and operation tools is calculated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.