Abstract

In this article, a novel method, called fitness distance ratio particle swarm optimization (FDR PSO) is employed to solve the optimal power flow (OPF) problem with ramp rate limits of the generators. The proposed method has been demonstrated on IEEE 30 bus test system and the results are compared with recently published works of the other optimization methods. Transient stability limit is incorporated while solving the OPF problem. Wheeling transactions are also carried out on the test system and their feasibility is checked with the transient stability limit of the generators. Contingency analysis is also carried out on the test system and the system stability is verified.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.