Abstract

This paper introduces a multi-objective fault indicator (FI) placement method in electric distribution systems. The prevalent FI placement problem formulation is extended by considering effects of existing protection and control devices on customers' restoration time. Moreover, the customers' average restoration time index (CARTI) is proposed, as a new technical objective function with respect to uncertainties of automatic switching. Furthermore, a multi-objective solution approach is developed to simultaneously minimize indispensable economic and technical objectives. The resultant optimization problem is solved through a multi-objective particle swarm optimization (MOPSO) based algorithm, accompanied by a fuzzy decision making method to select the best result among the obtained Pareto optimal set of solutions. Assuming SAIDI and CARTI as technical objectives, the proposed method is applied to bus number four of the Roy Billinton test system (RBTS4), as well as a real-life distribution network with about 5500 customers, followed by a discussion on results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.