Abstract
This study presents a case study investigation on failure analysis of drill pipe during the drilling operation and to establish a general understanding of fatigue failure with experiments and several tests. Drill pipe load comprises tensile, compression, bending, hydrostatic pressure and vibration, which causes damage due to fatigue failure to the drill pipe. The method involves subjecting a 2 in length and nominal diameter 3.25 in connection NC50 19.5 ppf drill pipe to predetermined caused failure by experimental tests and analysis. Mechanical examination such as tensile test and hardness test, and metallurgical examination such as spectrometry, fractography, SEM and EDX testing are conducted. The result shows that the cause of failure on the thread drill pipe was due to fatigue failure. It showed by the presence of microcracks, which accumulated from the load in the drill pipe. In addition, propagation of the crack at critical depth resulting in failure during drilling operations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.