Abstract

The significant improvement in plant stability offered by fast turbine valving is demonstrated from the results of transient stability studies at a fossil-fired steam plant of a large-scale power system. Rotor angle swings of the units and the resulting system power swings under a three-phase fault and stuck breaker contingency are analyzed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call