Abstract

AbstractAs a response to the drought of 1995–96, Yorkshire Water constructed an emergency water‐treatment plant to treat water from a flooded opencast site at St. Aidans near Leeds. The main process was low‐pressure reverse osmosis to remove ammonia and trace organic micro‐pollutants to produce the required water quality at all times. This paper describes the plant which was designed and constructed in thirteen weeks ‐ a fast‐track project which was made possible by the close cooperation between the client, the consultant, and the contractor.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.