Abstract

This article analyzes three types of supply contracts between a supplier and a retailer when both agree as follows—if a customer experiences a stockout, then the purchased item can be shipped to the customer on an expedited basis at no extra cost. This practice is referred to as the fast-ship option in this article. In the first contract (Structure A), the supplier specifies a total supply commitment and allows the retailer to choose its split between the initial order and the amount left to satisfy fast-ship orders. In the other two contracts (Structures B and C), the supplier agrees to fully supply the retailer’s initial order but places a restriction on the quantity available for fast-ship commitment. The difference between the second and third contracts is that in contract Structure B the supplier moves first, whereas in contract Structure C the supplier determines its commitment after observing the retailer’s order. The supplier’s and the retailer’s optimal decisions and preferences are characterized. The question of how the supplier and the retailer may resolve their conflict regarding the preferred contract type is addressed. [Supplementary materials are available for this article. Go to the publisher’s online edition of IIE Transactions for proofs.]

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.