Abstract

LED-ID (light emitting diode - identification) technology is the new paradigm in the identification technology environment. LED-ID system typically needs line of sight (LOS) that supports narrow FOV transceivers links to achieve high data rate. On the other hand, narrow FOV reduces the coverage area. Therefore, the number of tags is increased significantly to cover the whole area. In this case number of link switching is increased when the reader moves within whole coverage area. Link switching delay is the important factor for the moving reader to maintain the communication with high data rate and better QoS. In this paper we propose in literature a new link switching scheme and measure the link switching delay time for LED-ID system. The simulation results show that the proposed link switching scheme is a possible candidate for multi-tag LED-ID system.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.