Abstract

We are developing a new fast-kicker system for rare-RI ring at RIKEN RI beam factory. New fast-kicker system enables us to inject a rare particle into the ring individually, and also to extract the rare particle from the ring quickly. It consists of a kicker power supply, which has a fast-response mechanism and a hybrid charging system, and a large acceptance kicker magnet. Propagation time from a trigger signal input to the power supply until the flat-top center of the kicker magnetic field is approximately 465 ns, the result is sufficient to achieve an individual injection with an energy of 200 MeV/nucleon. Reliable operation of the hybrid charging system makes it possible to extract a particle from the ring in 700 μs by using the same kicker magnet. A waveform of the magnetic field is under investigation by using a prototype kicker magnet.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.