Abstract
Security constrained unit commitment (SCUC) is one of the most important daily tasks that independent system operators (ISOs) or regional transmission organizations (RTOs) must accomplish in daily electric power market. Security constraints have long been regarded as difficult constraints for unit commitment problems. If the inactive security constraints can be identified and eliminated, the SCUC problem can be greatly simplified. In this paper, a necessary and sufficient condition for a security constraint to be inactive is established. It is proved that all inactive constraints can be identified by solving a series of small-scale mixed integer linear programming (MILP) problems. More importantly, an analytical sufficient condition is established and most of the inactive constraints can be quickly identified without solving MILP or linear programming (LP) problems. A very important feature of the conditions obtained is that they are only related to the load demands and parameters of the transmission network. Numerical testing is performed for three power grids and the results are impressive. Over 85% of the security constraints are identified as inactive and the crucial transmission lines affecting the total operating cost are among those associated with the remaining security constraints, providing useful information for transmission planning.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.