Abstract
Fast evolutionary programming techniques are applied for the solution of a short-term hydrothermal scheduling problem. Evolutionary programming (EP)-based algorithms with Gaussian and other mutation techniques have been developed and tested on a multi-reservoir cascaded hydroelectric system having prohibited operating zones and a thermal unit with valve point loading. Numerical results show that all of the EP algorithms are capable of finding very nearly global solutions within a reasonable time but an EP algorithm with better of Gaussian and Cauchy mutations appears to be the best amongst all EPs in terms of convergence speed, solution time, and minimum cost.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.