Abstract

This paper presents a method to calculate the energy production of photovoltaic generators considering partial shading or mismatched conditions. The proposed method is based on the complete one-diode model including the bypass diode in its exponential form, where the current and voltage values of the modules composing the photovoltaic panel array are calculated without using the Lambert-W function. In addition, the method introduces a procedure to calculate the vicinity of the maximum power points, which enables the reduction of the operations required to obtain the global maximum. The proposed method provides short simulation times and high accuracy. On the other hand, since the method does not require complex mathematical functions, it can be implemented straightforwardly on known software packages and development languages such as C and C++. Those characteristics make this method a useful tool to evaluate the economic viability and return-of-investment time of photovoltaic installations. Simulation results and comparisons with a classical procedure confirm the good performance of the proposed method in terms of execution time and accuracy.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.