Abstract

Problem One of the phases with the highest risk of falls from a height in the construction of a building is during the floor slab formwork stage. This paper analyzes this particular risk , as well as the most frequently used fall-protection systems. Method A survey was carried out to define the current situation in Spain with regard to falls from a height during floor slab formwork and the fall-protection systems used to prevent such a risk. Results The results of the survey clarified the current situation in Spain with regard to this risk, and made it clear that there is considerable risk of falling from a height during the floor slab formwork stage. Discussion All the safety systems analyzed presented a series of weak points that should be studied in detail before they can be used on building sites. Impact on industry The risk of falling associated with floor slab formwork and the most frequently used protection systems are analyzed. As no research had been carried out to date on this type of risk, we consider the research presented in this article to be a pioneer in the field.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.