Abstract

This study intends to find out the inhibiting factors for the Central Sumatran National Road Implementation Center in Implementing Road Construction Supervision in Sijunjung District, Sijunjung Regency. As for the various problems of supervising actions that are very poorly implemented because there are still many roads with holes, there are still many supervisory deviations such as the work of handling road asphalt in Sijunjung District, Sijunjung Regency so that the results look careless and the supervisory function of the Regional National Road Implementation Center (BPJN) is not optimal. sources such as paving are not perfect so there are cracks and peeling. This research was conducted with a qualitative type with a descriptive method, in determining the informants the researcher used purposive sampling methods and techniques. For data collection techniques, interviews, observations, and documentation were carried out. In testing the validity of the data, the researcher used a method triangulation technique. As for the data analysis technique using data reduction, data presentation, and conclusions. The results showed that the inhibiting factors for the Central Sumatra Regional National Road Implementation in Carrying out Supervision of Road Construction in Sijunjung District, Sijunjung Regency, were the lack of field supervisory personnel and the lack of supervision costs as well as facilities and infrastructure

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.