Abstract
Type 304 stainless steel has been used to manufacture metal gaskets used as seals in bolted flange joints of hydrocarbon transfer pipeline in polyethylene plant and piping system used to distribute demineralized water in a polypropylene plant. During reassembling of ten joints after scheduled maintenance, heavy leakage has occurred in one joint. On the other hand, the water pipes have been drained and unused for about 2 months; however, after reuse, leakage has been detected. It is shown that the gasket has been crushed due to improper reassembling practice involving the application of excessive compressive preload generated by tightening the bolts. Most evidence pointed out that the water pipes have been degraded by pitting corrosion due to contamination of the water by chloride ions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.