Abstract
Risk-based inspection program (RBI) is a decision making techniques for providing refineries and petrochemical plants with an effective and appropriate inspection planning. The aim of the present study is to analyze failure behavior and risk ranking of α-MDEA fin/fan cooler of CO2 removal unit based on API 581 in order to find out the reason(s) of tubes failure. According to previous experience in similar plant, risk calculation results and conducted inspection activity by using RFT eddy current technique, CO2 corrosion damage mechanism was identified as a main reason of tubes failure. In next step, process key variable, prevention/mitigation methods and inspection planning programs were determined so as to minimize the similar failure behavior in the rest of the lean amine air-cooled heat exchangers of CO2 removal unit.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.